Jewel Holdings was contracted by Fraser River Pile & Dredge (GP) Inc to complete the installation of the new sewer forcemain for the Mission River Crossing Project.
Start Date: November 2021
Estimated Completion Date: March 2022
Project Engineer: Onsite Engineering Ltd.
The scope of work for the Mission River Crossing project includes:
- Welding 1 km of pipe together with lining and coatings.
- Fabrication and installation for tie-ins on either end of the pipe.